£2.99 + VAT
Download example Timber Hoarding Erection Method Statement Template
Timber Hoarding Erection Method Statement
This Timber Hoarding Erection Method Statement has been written by IOSH and NEBOSH qualified Safety Professionals. The document is delivered instantly to your email address ready for you to download and start editing straight away.
The template should be changed to suit the exact works you are carrying out.
Our Method Statements are comprehensive, between 4-7 pages long, with space for your company details and logo. The lists below are not exhaustive but give you a good indication as to the information included in the Method Statement you are going to purchase.
This Timber Hoarding Erection Method Statement covers:
- Preparation
- Installation of 2.4m timber hoarding – erect posts
- Alternative method of fixing using post hole and concrete casting
- Installation of horizontal rails and commercial plyboards
- Dismantling hoarding for removal
- Finishing
We include telephone support with all of our documents, call us on the number above for assistance.